“STUDI KELAYAKAN PEMBANGUNAN TANGKI TIMBUN BERDASARKAN ANALISIS WAITING TIME TERHADAP INTEGRATED PORT TIME PADA INTEGRATED TERMINAL X” (2024) Prosiding Seminar Nasional Teknologi Energi dan Mineral, 4(1), pp. 55–69. doi:10.53026/prosidingsntem.v4i1.18.