“ASSESMENT UNJUK KERJA BOILER TWA 6000 KG/H DI KILANG PPSDM MIGAS CEPU” (2024) Prosiding Seminar Nasional Teknologi Energi dan Mineral, 4(1), pp. 249–257. doi:10.53026/prosidingsntem.v4i1.90.