EVALUASI KINERJA TRI ETHYLENE GLYCOL DI CENTRAL PROCESSING PLANT LAPANGAN ENERGY EQUITY EPIC SENGKANG

Authors

  • Chandra Natuna Politeknik Energi dan Mineral Akamigas
  • Gerry Sasanti Nirmala Politeknik Energi dan Mineral Akamigas
  • Hermanto PT Energy Equity Epic (Sengkang) Pty.ltd

DOI:

https://doi.org/10.53026/prosidingsntem.v5i1.658

Keywords:

Amine Contactor, CPP Sengkang, Sweetening, TEG Contactor

Abstract

Proses pemurnian gas alam di Central Processing Plant (CPP) PT. Energy Equity Epic (Sengkang) Pty. Ltd. memiliki peran penting dalam menjamin kualitas gas sebelum disalurkan ke pembangkit listrik berkapasitas 135 MW di Sulawesi Selatan. Penelitian ini bertujuan menganalisis tahapan proses pemurnian yang meliputi pengukuran aliran gas (metering), pemisahan fasa cair dan gas (separator), penyaringan pengotor (coalescing filter), penghilangan gas asam menggunakan larutan MDEA pada Amine Contactor, pemurnian lanjutan di Sweet Gas Scrubber, serta dehidrasi gas menggunakan Triethylene Glycol (TEG) pada TEG Contactor. Hasil perhitungan menunjukkan kinerja penyerapan TEG terhadap H₂O sebesar 81%, masih di bawah standar desain 95%, yang disebabkan oleh kejenuhan TEG dan kontaminasi amine. Penerapan sistem regenerasi amine dan TEG secara optimal dapat meningkatkan efisiensi pemurnian dan menjaga keandalan operasi fasilitas. Dengan demikian, sistem pemurnian gas di CPP Sengkang berkontribusi besar terhadap keberlanjutan pasokan energi dan stabilitas listrik di wilayah Indonesia Timur.

References

Reuters, “Indonesia will divert LNG cargoes to local buyers in April–May, adjust Singapore exports,” Reuters, Apr. 9, 2025. [Online]. Available: https://www.reuters.com/business/energy/indonesia-will-divert-lng-cargoes-local-buyers-aprilmay-adjust-singapore-exports-2025-04-09/

A. L. Kohl and R. B. Nielsen, Gas Purification, 5th ed., Houston, TX: Gulf Publishing Company, 1997.

wbsakti’s world, “TEG Dehydration Unit (DHU),” Feb. 17, 2024. [Online]. Available: https://wbsakti.blogspot.com/2024/02/teg-dehydration-unit-dhu.html

D. S. Mahmud, “Analisis Sistem Distribusi Gas dari Lapangan Kampung Baru ke PLTGU Sengkang,” Tugas Akhir, Universitas Muslim Indonesia, Makassar, 2021

Haryono. 2014. Central processing plant 1. Energy Equty Epic (Sengkang) pty.Ltd.

Kinhil Engineer pty . Ltd. “Kampung Baru Development Star Up and commisoing procedurs” Energy Equty Epic (Sengkang) Pty. Ltd.

PT. Energy Equity Epic (Sengkang) Pty. Ltd. (2021). Laporan Operasi Central Processing Plant. Wajo: Internal Report.

Raj, H. (n.d.). W6L2_Sweeting of natural gas. Scribd. https://id.scribd.com/document/422624125/W6L2-Sweeting-of-Natural-Gas

Wbsaktiblog. (n.d.). TEG Dehydration Unit (DHU). https://wbsakti.blogspot.com/2024/02/tegdehydration-unit-dhu.html

A. J. Kidnay, W. R. Parrish, and D. G. McCartney, Fundamentals of Natural Gas Processing, 3rd ed. Boca Raton, FL: CRC Press, 2019.

Downloads

Published

2025-12-30

How to Cite

EVALUASI KINERJA TRI ETHYLENE GLYCOL DI CENTRAL PROCESSING PLANT LAPANGAN ENERGY EQUITY EPIC SENGKANG. (2025). Prosiding Seminar Nasional Teknologi Energi Dan Mineral, 5(1), 1070-1078. https://doi.org/10.53026/prosidingsntem.v5i1.658

Similar Articles

1-10 of 16

You may also start an advanced similarity search for this article.